Is the technical SPOC (Single Point Of Contact) for the assigned projects assigned.
§ Studies and analyses all technical documentation provided by internal/external stakeholders.
§ Checks that the information passed to him is consistent with the project budget, and feasibility of the project assigned. § Looks for missing information, reports issues to stakeholders and makes appropriate assumptions, in order to find the best possible technical solution.
§ After official approval received on the proposed solution from the functional manager, consults equipment documentation, in order to assign the proper equipment.
§ Produces all required technical documentation and calculations to illustrate and justify the technical solution to stakeholders and defines the required engineering resources to do so.
§ Instructs and follows-up the engineering team members appointed to his/her project to produce the technical documents.
§ Collaborates with different internal stakeholders to produce the required technical documentation for the execution of the projects assigned.
§ Provides technical support for rack related issues during the execution of the project.
§ Liaises with other engineering team members in order to improve the quality, efficiency and correctness of the technical documents. § Attends technical meetings, site inspections and on-site work if needed.
§ Assists the (internal) stakeholders on technical issues before and during execution to ensure proper implementation of the technical solution.
§ Being an Ambassador of stow towards all stakeholders.
§ Being responsible for the sourcing of external vendors for material, installation etc. according to the project budget.
§ Being responsible for the onsite realization, both pre-phase pre-sales assumptions, and realization execution phase.
§ Being responsible for the project cost budget/calculation and is during the realization phase reporting +/- deviations during project execution.
§ Being responsible for complying with local laws and guidelines in context with the realization of the project.